Projects in Progress for this Work Area
In-Progress
WT/MD/SD# | Project Stream | Abstract | Related Contributions | Editor(s) |
---|---|---|---|---|
WT-385 Issue 3, Amd 1 | YANG Modules for PON Management | This working text defines the NETCONF YANG model for following PON systems:
| Robert Peschi, Nokia Kevin Noll, Vecima | |
WT-489 Issue 1, Amd 1 | Authentication of an ONU and selection of eOMCI or vOMCI | WT-489 covers requirements concerning the authentication of ONUs and the decision whether it should rely on eOMCI or vOMCI. | Robert Peschi , Nokia | |
PMD Layer Test Plan | TR-243 defines new PON PMD measurement techniques and the test plan for use in PON PMD Conformance testing. Executing these test cases as part of a multi-supplier test event will help OLT's and ONU's implement the specifications so as to operate as a functional PON system. WT-423 Issue 3 adds test cases related to support of ITU-T HSP G.9804 TDM and G.9807.1. | Hugh Singleton, BT | ||
DTP-247 Issue 5 | PON Conformance Test Plan | TP-247 Issue 5 provides a test plan that may be used to verify conformance of a G-PON / XG-PON / XGS-PON ONU to the requirements defined in TR-156 and TR-280. Additionally, this test plan verifies that the OMCI implementation contained in a G-PON / XG-PON / XGS-PON ONU adheres to the practices described in Appendix I and II of G.988 DTP-247 adds ITU-T HSP G.9804 TDM test cases. | Vincent Buchoux, LAN | |
OD-283 | OMCI XML Schema for TP-247 PON Conformance Test Plan | OMCI MIB Schema for use in development of BBF TP-247 message sequences. It is a companion document to DTP-247. | Justin Nelson, UNH-IOL stephane bryant , MT2 | |
OD-284 | OMCI Message Sequence for TP-247 PON Conformance Test Plan | OMCI MIB Sequence for use in development of BBF TP-247 message sequences. It is a companion document to DTP-247. | Justin Nelson, UNH-IOL stephane bryant , MT2 | |
Framework for CWMP and USP enabled PON Devices | Vacant | |||
Using PON Access in the context of TR-101 | Vacant | |||
PON in the context of TR-178 | LE BRAS Hugues , Orange | |||
Architecture and Technical Requirements for PON based Mobile Backhaul Networks | Samuel Chen , Broadcom | |||
ONU Management at Scale | This working text defines the NETCONF YANG model for ONUs in a combined NE mode. | Robert Peschi , Nokia Joey Boyd , Adtran | ||
WT-509 | YANG modules for Cooperative Dynamic Bandwidth Assignment | This Working Text describes the YANG data models for Cooperative DBA (CO DBA) and Cooperative Transport Interface (CTI) server in ITU-T Passive Optical Networks (PON) OLT devices as defined in ITU-T G.984.x, ITU-T G.987.x, ITU-T G.989.x, ITU-T G.9807.x, ITU-T G.9804.x. The data models described in this working text address the Optical Line Termination (OLT). This data model reuses and in some cases augments existing IETF and BBF YANG models in TR-385 [1]. The support of CO DBA and CTI Server functionality in the OLT are optional. | François Fredricx , Nokia | |
WT-512 | PON OMCI SMA as EAP-OMCI Method | This Working Text maps the OMCI conventional three step sequence into the EAP framework defined in [IETF RFC 3748], as a new EAP method, referred to as EAP-OMCI. The EAP-OMCI method targets as close an alignment as possible with the EAP-GPSK method, while complying with the OMCI SMA defined in [ITU‑T G.988] clause 9.13.11. | Frank Van der Putten Nokia | |
WT-514 | OLT PON Management at Scale | This Working Text scope includes:
Reference NPIF: Proposed NPIF - Common YANG: Large System Management at Scale | Jian Zhu, Huawei Robert Peschi, Nokia |
Projects in Straw Ballot or Final Ballot
Please refer to Open Ballots for latest status of these documents.
WT/MD/SD# | PON Management Projects | Abstract | Related Contributions | Editor(s) |
---|---|---|---|---|
PON Conformance Test Plan | DTP-247 Issue 4 provides a test plan that may be used to verify conformance of a G-PON / XG-PON / XGS-PON ONU to the requirements defined in TR-156 and TR-280. Additionally, this test plan verifies that the OMCI implementation contained in a G-PON / XG-PON / XGS-PON ONU adheres to the practices described in Appendix I and II of G.988 This document is a corrigendum to TR-247 Issue 4. | Vincent Buchoux, LAN | ||
WT-255 Issue 2 is a BBF GPON/XGS/XG Interoperability test plan that describes a series of test cases that may be used to verify the interoperability of an OLT and ONU pairing according to the functional requirements of BBF TR-156, TR-280, and ITU-T G.988. It is intended that these test cases be used with an ONU already awarded the BBF.247 GPON ONU Certification and an OLT known to use standardized OMCI managed entities to implement the configuration under test. | Justin Nelson, UNH-IOL |
Recently Completed Projects for this Work Area
WT/MD/SD# (JIRA Link) PON Management Projects Abstract Related Contributions Editor(s) Robert Peschi , Nokia YANG Modules for PON Management This working text defines the NETCONF YANG model for following PON systems: Robert Peschi, Nokia Kevin Noll, Vecima PON TC Layer Test Plan TR-309 is the verification of XG-PON and XGS-PON OLT and ONU interoperability with respect to the TC sub-layer (ITU-T G.987.3, ITU-T G.9807.1 Annex C), and, indirectly as a result of testing the TC layer, to the PMD sub-layer (ITU-T G.987.2, ITU-T G.9807.1 Annex B). WT-309 Issue 3 merges WT-309 Issue 2 Amd 1 test cases and adds ITU-T HSP (G.9804) TDM and MSA 25GS-PON test cases. WT/MD/SD# (JIRA Link) Architectural Projects Abstract Related Contributions Editor(s) Multi-service Broadband Network Architecture and Nodal Requirements (TR-178) in the context of PON WT-280 documents a set of architectures for a broadband multi-service network, addressing typical infrastructures, topologies and deployment scenarios, and specifies the associated nodal requirements for PON Systems. Martin Renner , Maxlinear LE BRAS Hugues, Orange Framework for CWMP and USP enabled PON Devices The scope of TR-142 Issue 4 includes: Samuel Chen , Broadcom WT/MD/SD# (JIRA Link) Interoperability Test Assigned Projects Abstract Related Contributions Editor(s) DTP-247 Issue 4 defines G-PON & XG-PON & XGS-PON ONU test cases for TR-280 ITU-T PON compliant ONUs. Executing these test cases as part of a multi-supplier test event will help OLT and ONU's implementation of the specifications operate as a functional system. Vincent Buchoux, LAN Operators that plan to use ITU-T XG(S)-PON (with or without XG-PON), and NG-PON2 requested the FSAN and BBF Groups to document a PMD (Physical Media Dependent) layer test plan for Conformance Events. Executing these test cases as part of a multi-supplier test event will help OLT and ONU's implementation of the specifications operate as a functional system.WT-489 Issue 1 Authentication of an ONU and selection of eOMCI or vOMCI WT-489 covers requirements concerning the authentication of ONUs and the decision whether it should rely on eOMCI or vOMCI. WT-423 Issue 2 PMD Layer Test Plan Hal Roberts, Calix
Special Events
- 5th XGS PON Interoperability Test Event (see CONTRIB_21908 for details)
Hiatus FAN Projects
Hiatus projects are BBF projects that have open tickets however no activity has occurred on this project for over a year. The following BBF FAN Projects are considered to be in a "Hiatus" status:
- WT-142 Framework for TR-69 Enabled PON Devices
- MD-396 Gigabit Access over FTTx
- WT-156: Using GPON Access in the context of TR-101
- WT-311: Fiber Infrastructure Management System: Architecture and Requirements
- WT-312: GPON Management Requirements
- WT-331: Architecture & Technical Requirements for PON-based Mobile Backhaul networks
- WT-372: Framework-for-multi-management-PON-devices
- WT-394: NETCONF-managed ONT YANG Model
- WT-395: Discovery for NETCONF-managed ONUs
- WT-431
Moved FAN Projects
WT/SD | Title | Description | New WA |
---|---|---|---|
NETCONF and YANG Data Model Interoperability Test Plans | This working text defines the NETCONF test cases for OLT to 3rd party NETCONF clients. Executing these test cases as part of a multi-supplier test event will help OLT and 3rd party NETCONF client implementation of the specifications operate as a functional system. | SDN/NFV |
3 Comments
Manuel Paul
Is Gregs email address correct at the top of the page, or is it greg.bathrick@calix.com ?
Gregory Bathrick
Thank you Manuel, Either greg.bathrick@calix.com or Gregory.bathrick@calix.com are correct.
Wei Lin
Added SD-418