This document provides a certification test plan for ITU‑T Recommendation G.9700 “Fast access to subscriber terminals (G.fast) – Power spectral density specification” and G.9701 “Fast access to subscriber terminals (G.fast) – Physical layer specification”. This test plan is specifically conceived for the basic interoperability objectives of the Broadband Forum G.fast Certification Program. Technical content in this corrigendum is to correct some wrong references to other Broadband forum documents. With short copper loops required by G.fast Distribution Point Units (DPUs) that push the deployment of the DPU/MDUs closer to the customer premise, local power and forward power may not be viable to cost or location. To power the DPU, power will come from the customer premises location over the copper pair; this is referred to as Reverse Power Feed (RPF). This document specifies tests for the RPF functions of a DPU and the customer premises’ Power Supply Equipment (PSE) either as a stand-alone device or as a function integrated in a G.fast Network Termination. Issue 3 will define a set of RPF-over-coax functional and safety test cases for the Power Source Equipment (PSE) implemented according to ETSI specification TS 101 548-2, either as a stand-alone device or as a function integrated in the G.fast (G.9700 and G.9701) network termination, and reversely powered DPU implementations. It will include also RPF integrated in G.hn Access and MoCA Access network termination.Active Non-PS assigned Projects
WT/MD/SD# Projects Abstract Related Contributions Editors WT-285i2a1 Copper Transmission Models for Testing above 30 MHz Issue 2 Amendment 1 adds the Australian cable models as appendix G WT-285 WT-476 Performance Test Plan for use of G.hn technology in access scenarios The goal is to provide performance requirements between a G.hn Aggregation Multiplexer (GAM) and one or more G.hn Network Terminations (GNTs). The focus is on the device level (DLL and PHY) testing, similar to how TR-380 is defined. This performance test plan will include test setup information, equipment configuration requirements, test procedures, and performance requirements for each test case. WT-476 DTP-337i4c1 G.fast Certification Test Plan DTP-337 WT-338i3 Reverse Power Feed Test Plan WT-338
Completed or Inactive Project Streams
- These can be found on the PHYtx - Archived Project Streams and Projects page