Mission Statement:

The Physical Layer Transmission Work Area provides test plans, technical documentation, and marketing papers to enable multi-vendor interoperability in deployments for both access and in-premises networks.

Work Area Director: Les Brown, Huawei Technologies; Martin Casey, Calix

Business Impact:

As with the Fiber Access Networks work area, the focus is on cost reduction and accelerating time to market. Standardized interoperability and certification create a trusted base of equipment and services avoiding large investments in time, repeated customized one-off and NxN testing that impact revenue and credibility. Interoperability provides invaluable intelligence as feedback to both developers and implementers of new products and services. As the move to open sourcing gains momentum the role of interoperability becomes ever more necessary.

Scope:
  • Definition of test plans for access network physical layer transmission technologies (such as VDSL2 and G.fast) and Reverse Power Feeding technologies
  • Definition of test plans for in-premises network physical layer transmission technologies such as power line communications
  • Creation of best practice documentation for advanced features, such as Upstream Power Back-off, Self Install, and Vectoring

Project Streams

Project Stream

Description

PS Leaders

Non-PS Assigned

Projects that don’t fit under the scope of an existing Project Stream or if they fit under the scope of more than one Project Stream, are developed under the Non-PS Assigned category. 

Les Brown, Huawei Technologies

Project Stream

Description

PS Leaders

Bonding


Project Stream

Description

PS Leaders

G.fast and RPF Certification


Les Brown, Huawei Technologies

Frank Van der Putten, Nokia

Project Stream

Description

PS Leaders

Home Networking


Les Brown, Huawei Technologies

Marcos Martinez, MaxLinear  

Project Stream

Description

PS Leaders

VDSL2 Physical Layer Testing



Physical Layer Transmission Work Area Email List

memgen@broadband-forum.org

  • List for all BBF Members to receive general information

contrib@broadband-forum.org

  • List for notification of BBF Contribution Uploads/Updates in ARO

phytx@broadband-forum.org

  • List for BBF Physical Layer Transmission WA
  1. Sign in to ARO
  2. Scroll through to find the email list of interest to you
  3. Click Subscribe/Unsubscribe next to the list name

If you would like to learn what the subject matter of a list is, switch a list to digest mode (receive one email per-day with a summary of all emails sent to the list), view or search the archives or see whom else is subscribed; click on the list name.

PHYtx Calls, Minutes, Agendas

PHYtx Teleconference Calendar

Main Teleconference Calendar

Error rendering macro 'excerpt-include'

No link could be created for 'PHYtx master teleconference call calendar, agendas and reports'.


Pages in this space



WT/MD/SD#

(ARO Link)

Issues List

Non-PS Assigned Projects

(wiki Link)

Abstract

Related Contributions

Editors

WT-347

IL-347

CPE SELT Equipment Testing and Operation Guidelines

 

JIRA contributions

SD-285

 

Copper Transmission Models for Testing above 30 MHz

 

JIRA contributions

SD-336

 

Operations and Management to support Customer Self-Install

 

JIRA contributions

Peter Silverman, ASSIA Inc.

SD-405

TCP/UDP Traffic Generation for Testing


JIRA contributions

Daniel Moss, UNH IOL

WT/MD/SD#

(ARO Link)

Issues List

Bonding Projects

(wiki Link)

Abstract

Related Contributions

Editors

WT-273a1

IL-273

Testing of Bonded, Multi-Pair xDSL Systems - Amendment 1

 

JIRA contributions

Martin Casey, Calix Networks

WT-400

IL-400

Testing of Bonded, Multi-pair G.fast Systems

 

 JIRA contributions

Martin Casey, Calix Networks

Fred Chu, ADTRAN

WT/MD/SD#

(ARO Link)

Issues List

G.fast and RPF Certification Projects

(wiki Link)

Abstract

Related Contributions

Editors

ID-337

IL-337

FAST Certification Test Plan

 

JIRA contributions

WT-338

IL-338

Reverse Power Feed (RPF) Test Plan

This document specifies tests for the RPF functions of a DPU and the customer premises' Power Supply Equipment (PSE) either as a stand-alone device or as a function integrated in a FAST Network Termination.

Test cases are mainly specified with reference to ETSI TS 101 548 and BBF WT-301 requirements. Furthermore they are designed to ensure safe deployment of RPF equipment.

JIRA contributions

WT-380

IL-380

G.fast Performance Test Plan

 This document provides a set of functional, stability and performance test cases and related pass/fail requirements for G.fast implementations according to ITU‑T Recommendations G.9700 and G.9701

JIRA contributions

OD-334

 

Project Plan for G.fast & VDSL2 Testing for the FTTdp Architecture

 

JIRA contributions

Lincoln Lavoie, UNH InterOperability Lab

OD-335

IL-335

G.fast Interop Plugfest Test Plan

 

JIRA contributions

Martin Casey, Calix Networks

OD-362

IL-362

Program Requirements for G.fast Certification Program

 


Lincoln Lavoie, UNH InterOperability Lab

WT/MD/SD#

Issues Lists

Home Networking Projects

Abstract

Related Contributions

Editors

WT-381

 IL-381

Test Plan for Recommendation ITU-T G.9977 "Mitigation of Interference between DSL and PLC"

 

JIRA contributions

WT/MD/SD#

Issues Lists

VDSL2 Projects

Abstract

Related Contributions

Editors

WT-114i3

IL-114i3

VDSL2 Performance Test Plan - Issue 3

 This Broadband Forum Working Text, WT-114i3, as part of the Broadband Suite, provides a set of region specific performance requirements and test methods for VDSL2 modems implemented in accordance with ITU-T G.993.2 (Very high speed Digital Subscriber Line transceivers 2). Its key value is in the verification of performance such that network operators may deploy consistent and successful VDSL2 services in their networks.

JIRA contributions

WT-114i3a1

IL-114i3a1

VDSL2 Performance Test Plan - Issue 3 Amendment 1


JIRA contributions

WT-115i3a1

IL-115i3a1

VDSL2 Functionality Test Plan - Issue 3 Amendment 1

 This test plan describes a series of functionality tests that are used to verify that a VTU (VTU-O or VTU-R) is functionally compliant to ITU-T Recommendation G.993.2 (Very High Speed Subscriber Line transceiver 2). A VTU is functionally compliant to this test plan if it implements correctly the required functions and features of the ITU-T Recommendation G.993.2. In addition the VTU is functionally compliant if it implements the optional feature as specified in the standard. WT-115i3 also defines tests for some of the VDSL2 optional features such as dual latency and Seamless Rate Adaptation (SRA).

JIRA contributions

WT-249i2

IL-249i2

Testing of G.993.2 Self-FEXT Cancellation (vectoring) - Issue 2

This Working Text is intended to provide an interoperability/performance/functionality test plan for ITU T Recommendation G.993.5 "Self-FEXT cancellation (vectoring) for use with VDSL2 transceivers". Deployment scenarios in the scope of this Working Text include deployments from the Central Office (CO) and Fiber-To-The-x (FTTx) remote deployments.

The scope of this Working Text also covers validation of the functionality of the Control, Inventory, and Reported parameters defined in ITU T Recommendation G.997.1 for the related G.993.5 functionality.

JIRA contributions

WT-346

IL-346

VDSL2 UPBO Guidelines

 This Working Text provides informative guidance on VDSL2 UPBO (upstream power back off) settings for non-vectored VDSL2, and vectored VDSL2 with and without legacy VDSL2 in the same cable. 

JIRA contributions

Peter Silverman, ASSIA, Inc.

OD-297

IL-297

Interoperability Test Plan for G.Vector Plugfests

 

JIRA contributions

Working Texts

WT#TITLERELATED CONTRIBUTIONSEDITOR(S)
WT-114i3

VDSL2 Performance Test Plan - Issue 3

Click Here
WT-114i3a1

VDSL2 Performance Test Plan - Issue 3 Amendment 1

This Broadband Forum Working Text, WT-114i3, as part of the Broadband Suite, provides a set of region specific performance requirements and test methods for VDSL2 modems implemented in accordance with ITU-T G.993.2 (Very high speed Digital Subscriber Line transceivers 2). Its key value is in the verification of performance such that network operators may deploy consistent and successful VDSL2 services in their networks.

Click Here
WT-115i3a1

VDSL2 Functionality Test Plan - Issue 3 Amendment 1

This test plan describes a series of functionality tests that are used to verify that a VTU (VTU-O or VTU-R) is functionally compliant to ITU-T Recommendation G.993.2 (Very High Speed Subscriber Line transceiver 2). A VTU is functionally compliant to this test plan if it implements correctly the required functions and features of the ITU-T Recommendation G.993.2. In addition the VTU is functionally compliant if it implements the optional feature as specified in the standard. WT-115i3 also defines tests for some of the VDSL2 optional features such as dual latency and Seamless Rate Adaptation (SRA).

Click Here
WT-208i2

Performance Test Plan For In-premises Powerline Communications Systems

This document is aimed to provide industry, operators, and test labs with a well defined test bed and an established set of tests that enable a performance comparison between powerline products and technologies that can be independently verified.

Testing of wireline home-network transceivers from different vendors or technologies should be possible in a repeatable and reproducible fashion.

Click Here

Marcos Martinez, MaxLinear

WT-249i2

Testing of G.993.2 Self-FEXT Cancellation (vectoring) - Issue 2

This Working Text is intended to provide an interoperability/performance/functionality test plan for ITU T Recommendation G.993.5 "Self-FEXT cancellation (vectoring) for use with VDSL2 transceivers". Deployment scenarios in the scope of this Working Text include deployments from the Central Office (CO) and Fiber-To-The-x (FTTx) remote deployments.

The scope of this Working Text also covers validation of the functionality of the Control, Inventory, and Reported parameters defined in ITU T Recommendation G.997.1 for the related G.993.5 functionality.

Click Here
WT-273a1Testing of Bonded, Multi-Pair xDSL Systems - Amendment 1Click Here
WT-285a1

Broadband Copper Cable Models - Amendment 1

This Amendment to TR-285 adds a reference model for modern polyethylene-foam insulated plant quad structured cable (PE4D) as being deployed by various European network operators.

Click Here

Andre Holley, TELUS Communications, Inc.

WT-338

Reverse Power Feed (RPF) Test Plan

This document specifies tests for the RPF functions of a DPU and the customer premises' Power Supply Equipment (PSE) either as a stand-alone device or as a function integrated in a FAST Network Termination.

Test cases are mainly specified with reference to ETSI TS 101 548 and BBF WT-301 requirements. Furthermore they are designed to ensure safe deployment of RPF equipment.

Click Here
WT-346

VDSL2 UPBO Guidelines

This Working Text provides informative guidance on VDSL2 UPBO (upstream power back off) settings for non-vectored VDSL2, and vectored VDSL2 with and without legacy VDSL2 in the same cable.

Click Here

Peter Silverman, ASSIA, Inc.

WT-347CPE SELT Equipment Testing and Operation GuidelinesClick Here
WT-380G.fast Performance Test PlanClick Here
WT-381Test Plan for Recommendation ITU-T G.9977 "Mitigation of Interference between DSL and PLC"Click Here

Study Documents

SD#TITLERELATED CONTRIBUTIONSEDITOR(S)
SD-336Operations and Management to support Customer Self-InstallClick HerePeter Silverman, ASSIA Inc.
SD-285Copper Transmission Models for Testing above 30 MHzClick HereAndre Holley, Telus

Internal Documents

ID#TITLERELATED CONTRIBUTIONSEDITOR(S)
ID-337FAST Certification Test PlanClick Here Frank Van der Putten, Nokia

Issues List

Other Documents

OD#TITLERELATED CONTRIBUTIONSEDITOR(S)
OD-297Interoperability Test Plan for G.Vector PlugfestsClick HereOlivier van de Wiel, Broadcom
OD-334Project Plan for G.fast & VDSL2 Testing for the FTTdp ArchitectureClick HereLincoln Lavoie, UNH InterOperability Lab
OD-335G.fast Interop Plugfest Test PlanClick HereMartin Casey, Calix Networks
OD-362Program Requirements for G.fast Certification ProgramClick HereLincoln Lavoie, UNH InterOperability Lab

NPIFs


  • No labels