WT/MD/SD# (ARO Link) | Issues List | Non-PS Assigned Projects (wiki Link) | Abstract | Related Contributions | Editors |
---|---|---|---|---|---|
| Olivier van de Wiel, Broadcom | ||||
| Copper Transmission Models for Testing above 30 MHz |
| Andre Holley, Telus | ||
| Operations and Management to support Customer Self-Install |
| Peter Silverman, ASSIA Inc. | ||
SD-405 | Click Here | Daniel Moss, UNH IOL |
WT/MD/SD# (ARO Link) | Issues List | Bonding Projects (wiki Link) | Abstract | Related Contributions | Editors |
---|---|---|---|---|---|
| Martin Casey, Calix Networks | ||||
| Martin Casey, Calix Networks Fred Chu, ADTRAN |
WT/MD/SD# (ARO Link) | Issues List | G.fast and RPF Certification Projects (wiki Link) | Abstract | Related Contributions | Editors |
---|---|---|---|---|---|
| Frank Van der Putten, Nokia | ||||
This document specifies tests for the RPF functions of a DPU and the customer premises' Power Supply Equipment (PSE) either as a stand-alone device or as a function integrated in a FAST Network Termination. Test cases are mainly specified with reference to ETSI TS 101 548 and BBF WT-301 requirements. Furthermore they are designed to ensure safe deployment of RPF equipment. | Aleksandra Kozarev, Intel | ||||
| Herman Verbueken, Nokia | ||||
| Project Plan for G.fast & VDSL2 Testing for the FTTdp Architecture |
| Lincoln Lavoie, UNH InterOperability Lab | ||
G.fast Interop Plugfest Test Plan |
| Martin Casey, Calix Networks | |||
Program Requirements for G.fast Certification Program |
| Lincoln Lavoie, UNH InterOperability Lab |
WT/MD/SD# | Issues Lists | Home Networking Projects | Abstract | Related Contributions | Editors |
---|---|---|---|---|---|
Test Plan for Recommendation ITU-T G.9977 "Mitigation of Interference between DSL and PLC" |
| Vincent Buchoux, LAN |
WT/MD/SD# | Issues Lists | VDSL2 Projects | Abstract | Related Contributions | Editors |
---|---|---|---|---|---|
This Broadband Forum Working Text, WT-114i3, as part of the Broadband Suite, provides a set of region specific performance requirements and test methods for VDSL2 modems implemented in accordance with ITU-T G.993.2 (Very high speed Digital Subscriber Line transceivers 2). Its key value is in the verification of performance such that network operators may deploy consistent and successful VDSL2 services in their networks. | Aleksandra Kozarev, Intel | ||||
Aleksandra Kozarev, Intel | |||||
This test plan describes a series of functionality tests that are used to verify that a VTU (VTU-O or VTU-R) is functionally compliant to ITU-T Recommendation G.993.2 (Very High Speed Subscriber Line transceiver 2). A VTU is functionally compliant to this test plan if it implements correctly the required functions and features of the ITU-T Recommendation G.993.2. In addition the VTU is functionally compliant if it implements the optional feature as specified in the standard. WT-115i3 also defines tests for some of the VDSL2 optional features such as dual latency and Seamless Rate Adaptation (SRA). | Aleksandra Kozarev, Intel | ||||
Testing of G.993.2 Self-FEXT Cancellation (vectoring) - Issue 2 | This Working Text is intended to provide an interoperability/performance/functionality test plan for ITU T Recommendation G.993.5 "Self-FEXT cancellation (vectoring) for use with VDSL2 transceivers". Deployment scenarios in the scope of this Working Text include deployments from the Central Office (CO) and Fiber-To-The-x (FTTx) remote deployments. The scope of this Working Text also covers validation of the functionality of the Control, Inventory, and Reported parameters defined in ITU T Recommendation G.997.1 for the related G.993.5 functionality. | Herman Verbueken, Nokia | |||
VDSL2 UPBO Guidelines | This Working Text provides informative guidance on VDSL2 UPBO (upstream power back off) settings for non-vectored VDSL2, and vectored VDSL2 with and without legacy VDSL2 in the same cable. | Peter Silverman, ASSIA, Inc. | |||
| Olivier van de Wiel, Broadcom |
Working Texts
WT# | TITLE | RELATED CONTRIBUTIONS | EDITOR(S) |
---|---|---|---|
WT-114i3 | VDSL2 Performance Test Plan - Issue 3 | Click Here | Aleksandra Kozarev, Intel |
WT-114i3a1 | VDSL2 Performance Test Plan - Issue 3 Amendment 1 | Click Here | Aleksandra Kozarev, Intel |
WT-115i3a1 | VDSL2 Functionality Test Plan - Issue 3 Amendment 1 | Click Here | Aleksandra Kozarev, Intel |
WT-208i2 | Performance Test Plan For In-premises Powerline Communications Systems | Click Here | Marcos Martinez, MaxLinear |
WT-249i2 | Testing of G.993.2 Self-FEXT Cancellation (vectoring) - Issue 2 | Click Here | Herman Verbueken, Nokia |
WT-273a1 | Testing of Bonded, Multi-Pair xDSL Systems - Amendment 1 | Click Here | Martin Casey, Calix |
WT-285a1 | Broadband Copper Cable Models - Amendment 1 | Click Here | Andre Holley, TELUS Communications, Inc. |
WT-338 | Reverse Power Feed (RPF) Test Plan | Click Here | |
WT-346 | VDSL2 UPBO Guidelines | Click Here | Peter Silverman, ASSIA, Inc. |
WT-347 | CPE SELT Equipment Testing and Operation Guidelines | Click Here | Olivier van de Wiel, Broadcom |
WT-380 | G.fast Performance Test Plan | Click Here | Herman Verbueken, Nokia |
WT-381 | Test Plan for Recommendation ITU-T G.9977 "Mitigation of Interference between DSL and PLC" | Click Here | Vincent Buchoux, LAN |
Study Documents
SD# | TITLE | RELATED CONTRIBUTIONS | EDITOR(S) |
---|---|---|---|
SD-336 | Operations and Management to support Customer Self-Install | Click Here | Peter Silverman, ASSIA Inc. |
SD-285 | Copper Transmission Models for Testing above 30 MHz | Click Here | Andre Holley, Telus |
Internal Documents
ID# | TITLE | RELATED CONTRIBUTIONS | EDITOR(S) |
---|---|---|---|
ID-337 | FAST Certification Test Plan | Click Here | Frank Van der Putten, Nokia |
Issues List
IL# | TITLE | RELATED CONTRIBUTIONS | EDITOR(S) |
---|---|---|---|
IL-114i3 | WT-114 Issue 3 - Issues List | Click Here | Aleksandra Kozarev, Intel |
IL-114i3a1 | WT-114 Issue 3 Amendment 1 - Issues List | Click Here | Aleksandra Kozarev, Intel |
IL-115i3a1 | WT-115 Issue 3 Amendment 1 - Issues List | Click Here | Aleksandra Kozarev, Intel |
IL-208 | WT-208 Issue 2 Issues List | Click Here | Marcos Martinez, Marvell Semiconductors Inc. |
IL-249i2 | WT-249 Issue 2 - Issues List | Click Here | Herman Verbueken, Nokia |
IL-273 | WT-273 Amendment 1 Issues List | Click Here | Martin Casey, Calix |
IL-297 | OD-297 Issues List | Click Here | Olivier van de Wiel, Broadcom |
IL-335 | OD-335 Issues List | Click Here | Martin Casey, Calix Networks |
IL-337 | ID-337 Issues List | Click Here | Frank Van der Putten, Nokia |
IL-346 | WT-346 Issues List | Click Here | Peter Silverman, ASSIA, Inc. |
IL-347 | WT-347 Issues List | Click Here | Massimo Sorbara, Qualcomm Incorporated |
Other Documents
OD# | TITLE | RELATED CONTRIBUTIONS | EDITOR(S) |
---|---|---|---|
OD-297 | Interoperability Test Plan for G.Vector Plugfests | Click Here | Olivier van de Wiel, Broadcom |
OD-334 | Project Plan for G.fast & VDSL2 Testing for the FTTdp Architecture | Click Here | Lincoln Lavoie, UNH InterOperability Lab |
OD-335 | G.fast Interop Plugfest Test Plan | Click Here | Martin Casey, Calix Networks |
OD-362 | Program Requirements for G.fast Certification Program | Click Here | Lincoln Lavoie, UNH InterOperability Lab |