Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Mission Statement:

Excerpt

The Physical Layer Transmission Work Area provides test plans, technical documentation, and marketing papers to enable multi-vendor interoperability in deployments for both access and in-premises networks.

Work Area Director: Les BrownDirectors:

Herman Verbueken, Nokia

Evan Sun, Huawei Technologies

Business Impact:

The focus of the PHYtx WA is to develop technical recommendations which will help service providers deploy equipment that will give a better quality of experience for their end users.

As with the Fiber Access Networks work area, the focus is on cost reduction and accelerating time to market. Standardized interoperability and certification, create a trusted base of equipment and services providing operators with an accelerated time to market, avoiding large investments in time , repeated customized one-off and NxN testing that impact revenue and credibilityand customizations. Interoperability provides invaluable intelligence as feedback to both developers and implementers of new products and services. As the move to open sourcing gains momentum the role of interoperability becomes ever more necessary.

Scope:

Project Streams
  • Definition of test plans for access network physical layer transmission technologies (such as VDSL2 and G.fastGfast) and Reverse Power Feeding technologies
  • Definition of test plans for in-premises network physical layer transmission technologies such as power line communications
  • Creation of best practice or use cases documentation for advanced features, such as Upstream Power Back-off, Self Install, and Vectoring

ARO Work Area View https://aro.broadband-forum.org/bin/c5i?rid=68&k1=2

  • as  Fiber extensions, cable models.
Bonding
Multiexcerpt
MultiExcerptNamePHYtxActivePSPHYtxNonPS

Active Project Streams

Project Stream

Description

PS Leaders

Non

PHYtx -

PS Assigned

Projects

Projects that

don’t fit under the scope of an existing Project Stream or if they fit under the scope of more than one Project Stream, are developed under the Non-PS Assigned category. 

Les Brown, Huawei Technologies

Multiexcerpt
MultiExcerptNamePHYtxBondingPS

Project Stream

Description

PS Leaders

are handled on Work Area level.

Multiexcerpt
MultiExcerptNamePHYtxGfastCertPS

Project Stream

Description

PS Leaders

G.fast and RPF Certification

Les Brown, Huawei Technologies

Frank Van der Putten, Nokia

Multiexcerpt
MultiExcerptNamePHYtxHNPS

Project Stream

Description

PS Leaders

Home Networking

Les Brown, Huawei Technologies

Marcos Martinez, MaxLinear  

Multiexcerpt
MultiExcerptNamePHYtxVDSL2PS

Project Stream

Description

PS Leaders

VDSL2 Physical Layer Testing



Image Removed
Image Added

Physical Layer Transmission Work Area Email

List

Lists

memgen@broadband
  • List for all BBF Members to receive general information

contrib@broadband-forum.org

  • List for notification of BBF Contribution Uploads/Updates in ARO

phytx@broadband-forum.org

  • List for BBF Physical Layer Transmission WA
Expand
titleHow to subscribe to a mailing list...
  1. Sign in to ARO
  2. Scroll through to find the email list of interest to you
  3. Click Subscribe/Unsubscribe next to the list name
If you would like to learn what the subject matter of a list is, switch a list to digest mode (receive one email per-day with a summary of all emails sent to the list), view or search the archives or see whom else is subscribed; click on the list name.

PHYtx Calls, Minutes, Agendas

Expandtitleclick to expand ...

Teleconference

Main Teleconference Calendar

Excerpt IncludePHYtx master teleconference call calendar, agendas and reportsPHYtx master teleconference call calendar, agendas and reportsnopaneltrue

Pages in this space

Children Display
Multiexcerpt
MultiExcerptNamePHYtxNonProjects

See also:

Children Display

WT/MD/SD#

(ARO Link)

Issues List

Non-PS Assigned Projects

(wiki Link)

Abstract

Related Contributions

Editors

WT-347

IL-347

CPE SELT Equipment Testing and Operation Guidelines

 

Click Here

SD-285

 

Copper Transmission Models for Testing above 30 MHz

 

Click Here

SD-336

 

Operations and Management to support Customer Self-Install

 

Click Here

Peter Silverman, ASSIA Inc.

SD-405

TCP/UDP Traffic Generation for Testing

Click HereDaniel Moss, UNH IOL




PHYtxGfastCert

G.fast and RPF Certification Projects

(wiki Link)
Multiexcerpt
MultiExcerptNamePHYtxBondingProjects

WT/MD/SD#

(ARO Link)

Issues List

Bonding Projects

(wiki Link)

Abstract

Related Contributions

Editors

WT-273a1

IL-273

Testing of Bonded, Multi-Pair xDSL Systems - Amendment 1

 

Click Here

Martin Casey, Calix Networks

WT-400

IL-400

Testing of Bonded, Multi-pair G.fast Systems

 

 Click Here

Martin Casey, Calix Networks

Fred Chu, ADTRAN

Multiexcerpt
phytxactiveprojects

Active Projects

MultiExcerptName

WT/MD/SD#

(ARO Link)

Issues List

 Projects

AbstractRelated ContributionsEditors

ID-337

IL-337

FAST Certification Test Plan

 

Click Here

Frank Van der Putten, Nokia
WT-
338

IL-338

Reverse Power Feed (RPF) Test Plan

This document specifies tests for the RPF functions of a DPU and the customer premises' Power Supply Equipment (PSE) either as a stand-alone device or as a function integrated in a FAST Network Termination.

Test cases are mainly specified with reference to ETSI TS 101 548 and BBF WT-301 requirements. Furthermore they are designed to ensure safe deployment of RPF equipment.

Click Here

WT-380

IL-380

G.fast Performance Test Plan

 

Click Here

OD-334

 

Project Plan for G.fast & VDSL2 Testing for the FTTdp Architecture

 

Click Here

Lincoln Lavoie, UNH InterOperability Lab

OD-335

IL-335

G.fast Interop Plugfest Test Plan

 

Click Here

Martin Casey, Calix Networks

OD-362

IL-362

Program Requirements for G.fast Certification Program

 

Click Here

Lincoln Lavoie, UNH InterOperability Lab

Multiexcerpt
MultiExcerptNamePHYtxHNProjects

WT/MD/SD#

Issues Lists

Home Networking Projects

Abstract

Related Contributions

Editors

WT-381

 IL-381

Test Plan for Recommendation ITU-T G.9977 "Mitigation of Interference between DSL and PLC"

 

Click Here

Multiexcerpt
MultiExcerptNamePHYtxVDSL2Projects

WT/MD/SD#

Issues Lists

VDSL2 Projects

Abstract

Related Contributions

Editors

WT-114i3

IL-114i3

VDSL2 Performance Test Plan - Issue 3

 This Broadband Forum Working Text, WT-114i3, as part of the Broadband Suite, provides a set of region specific performance requirements and test methods for VDSL2 modems implemented in accordance with ITU-T G.993.2 (Very high speed Digital Subscriber Line transceivers 2). Its key value is in the verification of performance such that network operators may deploy consistent and successful VDSL2 services in their networks.

Click Here

WT-114i3a1

IL-114i3a1

VDSL2 Performance Test Plan - Issue 3 Amendment 1

Click Here

WT-115i3a1

IL-115i3a1

VDSL2 Functionality Test Plan - Issue 3 Amendment 1

 This test plan describes a series of functionality tests that are used to verify that a VTU (VTU-O or VTU-R) is functionally compliant to ITU-T Recommendation G.993.2 (Very High Speed Subscriber Line transceiver 2). A VTU is functionally compliant to this test plan if it implements correctly the required functions and features of the ITU-T Recommendation G.993.2. In addition the VTU is functionally compliant if it implements the optional feature as specified in the standard. WT-115i3 also defines tests for some of the VDSL2 optional features such as dual latency and Seamless Rate Adaptation (SRA).

Click Here

WT-249i2

IL-249i2

Testing of G.993.2 Self-FEXT Cancellation (vectoring) - Issue 2

This Working Text is intended to provide an interoperability/performance/functionality test plan for ITU T Recommendation G.993.5 "Self-FEXT cancellation (vectoring) for use with VDSL2 transceivers". Deployment scenarios in the scope of this Working Text include deployments from the Central Office (CO) and Fiber-To-The-x (FTTx) remote deployments.

The scope of this Working Text also covers validation of the functionality of the Control, Inventory, and Reported parameters defined in ITU T Recommendation G.997.1 for the related G.993.5 functionality.

Click Here

WT-346

IL-346

VDSL2 UPBO Guidelines

 This Working Text provides informative guidance on VDSL2 UPBO (upstream power back off) settings for non-vectored VDSL2, and vectored VDSL2 with and without legacy VDSL2 in the same cable. 

Click Here

Peter Silverman, ASSIA, Inc.

OD-297

IL-297

Interoperability Test Plan for G.Vector Plugfests

 

Click Here

Working Texts

WT#TITLERELATED CONTRIBUTIONSEDITOR(S)WT-114i3

VDSL2 Performance Test Plan - Issue 3

Click HereWT-114i3a1

VDSL2 Performance Test Plan - Issue 3 Amendment 1

Expand
titleAbstract ...

This Broadband Forum Working Text, WT-114i3, as part of the Broadband Suite, provides a set of region specific performance requirements and test methods for VDSL2 modems implemented in accordance with ITU-T G.993.2 (Very high speed Digital Subscriber Line transceivers 2). Its key value is in the verification of performance such that network operators may deploy consistent and successful VDSL2 services in their networks.

Click HereWT-115i3a1

VDSL2 Functionality Test Plan - Issue 3 Amendment 1

Expand
titleAbstract ...

This test plan describes a series of functionality tests that are used to verify that a VTU (VTU-O or VTU-R) is functionally compliant to ITU-T Recommendation G.993.2 (Very High Speed Subscriber Line transceiver 2). A VTU is functionally compliant to this test plan if it implements correctly the required functions and features of the ITU-T Recommendation G.993.2. In addition the VTU is functionally compliant if it implements the optional feature as specified in the standard. WT-115i3 also defines tests for some of the VDSL2 optional features such as dual latency and Seamless Rate Adaptation (SRA).

Click HereWT-208i2

Performance Test Plan For In-premises Powerline Communications Systems

Expand
titleAbstract ...

This document is aimed to provide industry, operators, and test labs with a well defined test bed and an established set of tests that enable a performance comparison between powerline products and technologies that can be independently verified.

Testing of wireline home-network transceivers from different vendors or technologies should be possible in a repeatable and reproducible fashion.

Click Here

Marcos Martinez, MaxLinear

WT-249i2
500MoCA Access Performance Test Plan

MoCA AccessTM technology can be used to deliver gigabit and multi-gigabit services to the end-user in the scope of Fiber Extension (FTTep). It has been defined as one of the the available technologies in TR-419. MoCA has been defined by the Multimedia over Coax Alliance  (https://mocalliance.org). MoCA Acces supports broadband data transmission in the access environment - including large apartment and office buildings (the MDU environment).

The focus of this performance test plan is on the Physical layer and Traffic testing similar to how TR-380 and TR-476 are defined.  This performance test plan will include test setup information, equipment configuration requirements, test procedures, and performance requirements. Traffic tests should show the throughput and delay for various packet sizes and mixes for the various use cases

WT-500

Helge Tiainen 
WT-301i2a3Architecture and Requirements for Fiber to the Distribution Point

TR-301defines the Distribution Point Unit (DPU), for use within the access network. All aspects of the introduction of the DPU into the network are considered and requirements are specified for the DPU and all affected nodes in the access network along with the RPF functionality.

Amendment 3 adds requirements for bulk data collection (using IPFIX) using the data model as defined in Broadband Forum.

WT-301




Completed or Inactive  Project Streams

Testing of G.993.2 Self-FEXT Cancellation (vectoring) - Issue 2

Expand
titleAbstract ...

This Working Text is intended to provide an interoperability/performance/functionality test plan for ITU T Recommendation G.993.5 "Self-FEXT cancellation (vectoring) for use with VDSL2 transceivers". Deployment scenarios in the scope of this Working Text include deployments from the Central Office (CO) and Fiber-To-The-x (FTTx) remote deployments.

The scope of this Working Text also covers validation of the functionality of the Control, Inventory, and Reported parameters defined in ITU T Recommendation G.997.1 for the related G.993.5 functionality.

Click HereWT-273a1Testing of Bonded, Multi-Pair xDSL Systems - Amendment 1Click HereWT-285a1

Broadband Copper Cable Models - Amendment 1

Expand
titleAbstract ...

This Amendment to TR-285 adds a reference model for modern polyethylene-foam insulated plant quad structured cable (PE4D) as being deployed by various European network operators.

Click Here

Andre Holley, TELUS Communications, Inc.

WT-338

Reverse Power Feed (RPF) Test Plan

Expand
titleAbstract ...

This document specifies tests for the RPF functions of a DPU and the customer premises' Power Supply Equipment (PSE) either as a stand-alone device or as a function integrated in a FAST Network Termination.

Test cases are mainly specified with reference to ETSI TS 101 548 and BBF WT-301 requirements. Furthermore they are designed to ensure safe deployment of RPF equipment.

Click HereWT-346

VDSL2 UPBO Guidelines

Expand
titleAbstract ...

This Working Text provides informative guidance on VDSL2 UPBO (upstream power back off) settings for non-vectored VDSL2, and vectored VDSL2 with and without legacy VDSL2 in the same cable.

Click Here

Peter Silverman, ASSIA, Inc.

WT-347CPE SELT Equipment Testing and Operation GuidelinesClick HereWT-380G.fast Performance Test PlanClick HereWT-381Test Plan for Recommendation ITU-T G.9977 "Mitigation of Interference between DSL and PLC"Click Here

Study Documents

SD#TITLERELATED CONTRIBUTIONSEDITOR(S)SD-336Operations and Management to support Customer Self-InstallClick HerePeter Silverman, ASSIA Inc.SD-285Copper Transmission Models for Testing above 30 MHzClick HereAndre Holley, Telus

Internal Documents

ID#TITLERELATED CONTRIBUTIONSEDITOR(S)ID-337FAST Certification Test PlanClick Here Frank Van der Putten, Nokia

Issues List

IL#TITLERELATED CONTRIBUTIONSEDITOR(S)IL-114i3WT-114 Issue 3 - Issues ListClick HereAleksandra Kozarev, IntelIL-114i3a1WT-114 Issue 3 Amendment 1 - Issues ListClick HereAleksandra Kozarev, IntelIL-115i3a1WT-115 Issue 3 Amendment 1 - Issues ListClick HereAleksandra Kozarev, IntelIL-208WT-208 Issue 2 Issues ListClick HereMarcos Martinez, Marvell Semiconductors Inc.IL-249i2WT-249 Issue 2 - Issues ListClick HereHerman Verbueken, NokiaIL-273WT-273 Amendment 1 Issues ListClick HereMartin Casey, CalixIL-297OD-297 Issues ListClick HereOlivier van de Wiel, BroadcomIL-335OD-335 Issues ListClick HereMartin Casey, Calix NetworksIL-337ID-337 Issues ListClick Here Frank Van der Putten, NokiaIL-346WT-346 Issues ListClick HerePeter Silverman, ASSIA, Inc.IL-347WT-347 Issues ListClick HereMassimo Sorbara, Qualcomm Incorporated

Other Documents

OD#TITLERELATED CONTRIBUTIONSEDITOR(S)OD-297Interoperability Test Plan for G.Vector PlugfestsClick HereOlivier van de Wiel, BroadcomOD-334Project Plan for G.fast & VDSL2 Testing for the FTTdp ArchitectureClick HereLincoln Lavoie, UNH InterOperability LabOD-335G.fast Interop Plugfest Test PlanClick HereMartin Casey, Calix NetworksOD-362Program Requirements for G.fast Certification ProgramClick HereLincoln Lavoie, UNH InterOperability LabNPIFs