You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 156 Next »

2017 Q2 Face to Face Meeting - Taipei

ItemTimeslot / Session /LocationAction/Status/Comments/Who
1

Monday 15th May 2017

13:30-15:30

North Gate (Level B1)

Non PS Aligned


Agenda bashing


IPR declarations


Meeting Minutes:



Incoming Liaisons:


NPIFS:

Led by: Christopher Croot, Sven Ooghe


Attendees: Joey Boyd, Ludwig Pauwels, Nick Hancock,Chin-Ping Chuang (CHT), Ya-Ping Huang (CHT), Jose Salgado (Altice Labs), Robert Peschi


IPR declarations : no declarations


Meeting minutes: the minutes have been approved as uploaded on ARO and as written on the BBF FTTdp wiki page.


Incoming liaisons: None


NPIFs: there were no new NPIFs
2

Tuesday 16th May 2017

08:00-10:00

East Gate (Level B1)


FTTdp Management PS



WT-355 - YANG Modules for FTTdp Mgmt:

2017.446, 2017.485


Led by: Joey Boyd, Ken Kerpez


Attendees:


WT-355 YANG Modules for FTTdp Management:

2017.446 - Changes for inclusion in WT-355c2. The following items were discussed:

  • Line 380 in bbf-fast-pointers.yang, agreed to update description
  • Line 434 in bbf-vdsl-impulse-noise-protection-delay-profile-body.yang, agreed to deprecate upstream mdosplit and explain in the description that upstream + downstream = 100% so that's why upstream was deprecated.

  • Line 476 in bbf-vdsl-impulse-noise-protection-delay-profile-body.yang, agreed to deprecate upstream and fix description

  • Line 504 in bbf-vdsl-impulse-noise-protection-delay-profile-body.yang, agreed to deprecate upstream and fix description

  • Line 119 in bbf-vdsl-line-spectrum-profile-body.yang, no change agreed

  • Line 137 in bbf-vdsl-line-spectrum-profile-body.yang, agreed to add default "all" to power-management-mode

  • Line 202 in bbf-vdsl-line-spectrum-profile-body.yang, agreed to add must statement: l2-maximum-aggregate-power-reduction-per <= l2-maximum-aggregate-power-reduction-total

  • Line 253 in bbf-vdsl-mode-specific-psd-profile-body.yang, not agreed, no change made to upstream_psd_mask_selection

    • Agreed to add text to OD-360 noting that backward compatibility is more important than changing style issues.
  • Line 152 in bbf-vdsl-noise-margin-profile-body.yang, agreed to expand the must statement for maximum-noise-margin by adding: or (max == "unbounded")

  • Line 370 in bbf-vdsl-pointers.yang, leaf line-config-vector, no change agreed

  • Line 380 in bbf-vdsl-pointers.yang, threshold-template, agreed to add to description field: "If no template is configured, then TCA reporting is disabled."

  • Line 103 in bbf-vdsl-virtual-noise-profile-body.yang, grouping vn-descriptor, agreed to make max-elements be 16 for upstream and 32 for downstream

  • Line 167 in bbf-vdsl-virtual-noise-profile-body.yang, virtual-noise-profile (downstream), agreed to add a must statement so that there cannot be a single element

  • Line 219 in bbf-vdsl-virtual-noise-profile-body.yang, virtual-noise-profile (upstream), agreed to add a must statement so that there cannot be a single element

  • Line 270 in bbf-vdsl-xtu-band-status-body.yang, upbo-electrical-length-pbn, agreed to add to description "For ADSL systems, a single parameter is defined for band = 0, as a single band is usable."

  • Line 302 in bbf-vdsl-xtu-line-status-body.yang, profile, agreed to remove config false; (other spurious config false; occurrences should also be searched and destroyed)

  • Line 420 in bbf-vdsl-xtu-line-status-body.yang, attndr-actual-method, agreed to change valid range to 0..2

There were some additional rows in the contribution that were inadvertently copied, were redundant, and not addressed.

It was agreed to create a WT-355 Corrigendum 2, post it on Bitbucket, and proceed to a rapid straw ballot


2017.485.01 - Awareness of new FTU Management Counter

  • Notes that a new counter is being defined by the ITU for G.fast: All Normal Operation Interval (NOI) Error Free Throughput (ANDEFTR). This is likely to be consented by the ITU in June, there is no action by the BBF at this time but we should be ready for it.



 

3

Tuesday 16th May 2017

10:30-12:30

East Gate (Level B1)

JOINT SESSION  

Fiber to the Distribution Point

Common YANG

Common YANG /  FTTdp Management PS


WT-383a1 Common YANG Modules for Access Networks, cont.


Events and Notifications:

2017.332.00, 2017.425.00, 2017.442.00


Ethernet:

2017.323.01, 2017.373.00


Performance monitoring:

2017.339.00


QoS:

2017.369.00, 2017.444.00




Attendees:



 

Events and Notifications:

2017.332.00, 2017.425.00, 2017.442.00


Ethernet:

2017.323.01, 2017.373.00


Performance monitoring:

2017.339.00


QoS:

2017.369.00, 2017.444.00

4

Tuesday 16th May 2017

13:30-15:30

Far Eastern Grand Ballroom (Level 3)

JOINT SESSION  

Fiber to the Distribution Point

Common YANG

Fibre Access Networks

Common YANG

FTTdp Management

PON Management



SPAC readout on NC/Y and FTTdp testing needs: 2017.435.00 (NPIF), 2017.452.00


WT-355a1 YANG Modules for FTTdp Mgmt:

2017.392.00


WT-383a1 Common YANG Modules for Access Networks, cont.

Security:

2017.337.00


Hardware:

2017.370.00, 2017.385.00


Other:

2017.264.00, 2017.336.01, 2017.338.00, 2017.384.00

Attendees:





 








SPAC readout on NC/Y and FTTdp testing needs:

2017.435.00 (NPIF), 2017.452.00


WT-355a1 YANG Modules for FTTdp Mgmt:

2017.392.00


WT-383a1 Common YANG Modules for Access Networks, cont.

Security:

2017.337.00


Hardware:

2017.370.00, 2017.385.00


Other:

2017.264.00, 2017.336.01, 2017.338.00, 2017.384.00


5

Tuesday 16th May 2017

16:00-18:00

Premier (Level 3)

JOINT SESSION  

Fiber to the Distribution Point

Physical Layer Transmission


Liaisons:

General

2017.485 - Awareness of new FTU Management Counter


WT-301 Arch and Req for FTTdp:

2017.493 - DPU daisy chaining

2017.496 - Alternative DPU backhaul


i2 FTTdp on Common G.fast and RPF:


FTTdp Management Interop and Testing

OD-379 Interoperability Test Plan for FTTdp PMA/DPU

Management Interface:

2017.452 - Copper Interface Status test proposal


Led by: Les BrownDong Wei

 

Attendees :

Chris Croot, Sven Ooghe, David Thorne, Kevin Foster, Tony Zeng, Richard Goodson, Ken Kerpez, Frank Van der Putten, Aleksandra Kozarev, Fred Chu, Martin Casey, Sven Leimer, Herman Verbueken, Marta Seda, Tom Starr, Erez Ben-Tovim, Madu Hegde, Mercel Reitmann, Eric Wang, Les Humphrey, Jo Maes, Macin Drzymala

General

2017.485.01 - Awareness of new FTU Management Counter

  • Presented by Chris Croot (BT)
  • For information only


WT-301 Arch and Req for FTTdp:

2017.493.01 - DPU daisy chaining

  • Presented by Dave Thorne (BT)


2017.496 - Alternative DPU backhaul


i2 FTTdp on Common G.fast and RPF:


FTTdp Management Interop and Testing

OD-379 Interoperability Test Plan for FTTdp PMA/DPU

Management Interface:

2017.452 - Copper Interface Status test proposal


 


6

 

Thursday 23rd March 2017 

13:30-16:00

 East Gate (Level B1)

JOINT SESSION  

Fiber to the Distribution Point

Common YANG


OD-360 Best Current Practices for developing YANG models:

2017.183.00


WT-383a1 Common YANG, cont.


Non-PS Assigned:

Agree next steps
Finalize outgoing liaisons
Teleconference schedule
Closing plenary slides

Led by: Christopher Croot, Sven Ooghe


Attendees:


OD-360 Best Current Practices for developing YANG models:

2017.183.00


WT-383a1 Common YANG, cont.



Agree next steps: due to the light load of contributions, we anticipate we only need a single session in the next meeting.

Finalize outgoing liaisons

Teleconference schedule

Closing plenary slides




Recent Meetings

2017 Q1 Face to Face Meeting - Chicago

ItemTimeslot / Session /LocationAction/Status/Comments/Who
1

Monday 20th March 2017

13:30-15:30

State A (8th Floor)

Non PS Aligned


Agenda bashing

IPR declarations

Meeting Minutes: 2016.983, 2016.982, 2016.1147, 2016.1145, 2016.1144, 2016.1142


Incoming Liaisons:

2016.1237.00,

2016.1247.00,

2016.1267.00,

2016.1286.00,

2017.073.00,

2017.091.00


NPIFS:

Led by:

Sven Ooghe


Attendees: Sumithra Bhojan, Joey Boyd, Dong Wei, Nick Hancock


Meeting minutes: the minutes have been approved as uploaded on ARO and as written on the BBF FTTdp wiki page.


Incoming liaisons:

2016.1237.00: ITU-T Q4 on requirements for mobile backhaul. No action required (deadline for feedback passed)

2016.1247.00: ETSI TM6 on PE-PEB for Reverse Power Feeding

Should have been covered during the comment resolution of WT-301 issue 2. Dong will check with Mike.

2016.1267.00: IEEE 802.3 reply to BBF laison on "Low Power Modes for Fibre backhaul for FTTdp". Informational, no action required.

2016.1286.00: SG15 reply to liaison on “Low Power Modes for Fibre backhaul for FTTdp”. Informational, no action required.

2017.073.00: TM6 on additional RPF OAM and DPU Managed Objects. BBF in copy, sent to us for information. No action required at this time.

2017.091.00: SG15 on G.997.2 IARBANDS managed object

Has been integrated in the latest WT-355 YANG modules, no further action needed.


NPIFs: there were no new NPIFs
2

Tuesday 21st March 2017

08:00-10:00

LaSalle (7th Floor)


FTTdp Management Interop & Testing PS / FTTdp Management PS

OD-379 Interoperability Test Plan for FTTdp PMA/DPU Management Interface:

2017.120.00

2017.211.00


WT-355c1 YANG Modules for FTTdp Mgmt (Passed FB):

2016.1241.03

2017.055.02


WT-355a1 YANG Modules for FTTdp Mgmt:

2017.132.00

2017.126.00

2017.129.00


WT-298i2 Mgmt. model for DSL line test (Passed FB):

2016.386.04


Led by: Joey Boyd, Ken Kerpez


Attendees: Lincoln Lavoie, Martin Casey, Ken Kerpez, Sven Ooghe, Joey Boyd


OD-379 Interoperability Test Plan for FTTdp PMA/DPU Management Interface:

2017.120.00, "Parameter Read/Write Tests Proposal" (Kerpez, Ken, ASSIA; Peter Silverman, ASSIA; Drzymala, Marcin, Orange)

  • Agree to adopt the two proposed test cases as working text into OD-379.

2017.211.00, "DPU-PMA discovery tests proposal" (Drzymala, Marcin, Orange; Parol, Pawel, Orange; Kerpez, Ken, ASSIA)

  • Agree to adopt the proposed test setups, with the the following change: the packet sniffer should be connected to the HON port, configured to mirror the traffic on the access link.
  • Agree to adopt the four proposed text cases, adding the following editors note:
    • The verification of TLS parameters is subject to the availability of these parameters outside of the encrypted channel.

WT-355c1 YANG Modules for FTTdp Mgmt (Passed FB):

2016.1241.03

  • Reviewed for information, WT-355c1 is in the process of being published on public Github

2017.055.02

  • Reviewed for information, all resolutions are green now

WT-355a1 YANG Modules for FTTdp Mgmt:

2017.132.00

  • Agreed to put these changes into WT-355 Amd 1, in release 1.1 on Bitbucket

2017.126.00

  • Frank Van der Putten to draft a liaison to ITU-T SG15/Q4, cc'd to ETSI, on Question 2.
  • Agreed as baseline, subject to changing base identity depending on further work.

2017.129.00

  • Discussed all issues, disposition is posted on JIRA:

    Key Summary T Created Updated Due Assignee Reporter P Status Resolution
    Loading...
    Refresh

WT-298i2 Mgmt. model for DSL line test (Passed FB):

2016.386.04

  • It was noted that WT-298i2 passed final ballot.

 

3

Tuesday 21st March 2017

10:30-12:30

LaSalle (7th Floor)


FTTdp Management Interop & Testing PS / FTTdp Management PS


WT-355a1 YANG Modules for FTTdp Mgmt, cont.



WT-355a1 YANG Modules for FTTdp Mgmt, cont.


 

4

Tuesday 21st March 2017

13:30-15:30

South Ballroom (8th Floor)

JOINT SESSION  

Fiber to the Distribution Point

Common YANG

FTTdp Management PS


WT-355a1 YANG Modules for FTTdp Mgmt:

2017.188.00,

2017.133.00,

2017.166.00,

2017.175.00,

2017.178.00


WT-355a1 and WT-383 cont:

5

Tuesday 21st March 2017

16:00-18:00

South Ballroom (8th Floor)

JOINT SESSION  

Fiber to the Distribution Point

Physical Layer Transmission

Architecture & Requirements PS


Liaisons:

2016.1286.00

2017.091.00

2017.240.00


WT-301i2 FTTdp on Common G.fast and RPF issues:

2017.251.00

Led by: Les BrownDong Wei

 

Attendees : about 30

 

Liaisons:

2017.240.00

  • Agreed to the following revisions: remove the figure, reference to the figure in the original document; replace Olivier with Aleksandra as the liaison communication person to ETSI TM6

 

2016.1286.00

  • Agreed to send a liaison to ITU-T Q2/15 and Q4/15 to address the issue about communication of low power mode information between the G.fast sub-system and the optical backhaul sub-system (Les Humphrey volunteered to prepare a draft liaison, which will be reviewed at a PHYtx session later this week)

 

2017.091.00

  • No action needed as it has already been implemented in WT-355c1

 

WT-301 (FTTdp Architectures and Requirements):

WT-301i2 Final Ballot

  • Agreed to make the following editorial change to WT-301i2: the sub-option numbers for DPU discovery and PMA offer from 160 and 161 to 192 and 193, respectively, and to inform the BBF secretary of the change 

 

2017.251.00

  • No action needed as the authors only asked for feedbacks.

 


6

 

Thursday 23rd March 2017 

13:30-16:15

 LaSalle (7th Floor)

JOINT SESSION  

Fiber to the Distribution Point

Common YANG


OD-360 Best Current Practices for developing YANG models:

2017.183.00

WT-383a1 Common YANG (new and updated proposals):

cont.


Retrospective on our experiences with YANG & how to improve the process: we will look back to the recent work in WT-355 and WT-383 and answer the following questions: What did we do well? What did we not do well? How can we improve going forward?


Non-PS Assigned:

Agree next steps Finalize outgoing liaisons Teleconference schedule Closing plenary slides

Led by: Sven Ooghe, William Lupton

Attendees: Joey Boyd, Richard Goodson, Nick Hancock, Ludwig Pauwels, Bjoern Nagel, Mike Shaffer, Ken Kerpez, Marta Seda, Raidu Rayasam, Samuel Chen, Charles Cook


Closing plenary slides were reviewed and agreed with the group

Proposed liaison bbf2017.240.02 on RPF over coax for G.fast was reviewed and agreed with the group


OD-360 Best Current Practices for developing YANG models:

2017.183.00



WT-383a1 Common YANG (new and updated proposals):



Retrospective on our experiences with YANG & how to improve the process:



Agree next steps

Finalize outgoing liaisons

Teleconference schedule

Closing plenary slides




Archived & Agreed Minutes / Agendas








  • No labels