Projects in Progress for this Work Area
In-Progress
WT/MD/SD# |
---|
Project Stream | Abstract | Related Contributions | Editor(s) |
---|---|---|---|
WT-385 Issue 3, Amd 1 | YANG Modules for PON Management |
MultiExcerptName | FANInterTestProjects |
---|
WT/MD/SD#
(JIRA Link)
Interoperability Test Assigned Projects
Abstract
Related Contributions
Editor(s)
This working text defines the NETCONF YANG model for following PON systems:
|
| Robert Peschi, Nokia Kevin Noll, Vecima | ||||||||||
WT-489 Issue 1, Amd 1 | Authentication of an ONU and selection of eOMCI or vOMCI | WT-489 covers requirements concerning the authentication of ONUs and the decision whether it should rely on eOMCI or vOMCI. |
| Robert Peschi , Nokia | ||||||||
PMD Layer Test Plan | TR-243 defines new PON PMD measurement techniques and the test plan for use in PON PMD Conformance testing. Executing these test cases as part of a multi-supplier test event will help OLT's and ONU's |
implement the specifications so as to operate as a functional PON system. WT-423 Issue 3 adds test cases related to support of ITU-T HSP G.9804 TDM and G.9807.1. |
| Hugh Singleton, BT | ||||||||||
DTP-247 Issue 5 | PON Conformance Test Plan | TP-247 Issue 5 provides a test plan that may be used to verify conformance of a G-PON / XG-PON / XGS-PON ONU to the requirements defined in TR-156 and TR-280. Additionally, this test plan verifies that the OMCI implementation contained in a G-PON / XG-PON / XGS-PON ONU adheres to the practices described in Appendix I and II of G.988 DTP-247 adds ITU-T HSP G.9804 TDM test cases. | Vincent Buchoux, LAN | |||||||||
OD-283 | OMCI XML Schema for TP-247 PON Conformance Test Plan | OMCI MIB Schema for use in development of BBF TP-247 message sequences. It is a companion document to DTP-247. | Justin Nelson, UNH-IOL stephane bryant , MT2 | |||||||||
OD-284 | OMCI Message Sequence for TP-247 PON Conformance Test Plan | OMCI MIB Sequence for use in development of BBF TP-247 message sequences. It is a companion document to DTP-247. | Justin Nelson, UNH-IOL stephane bryant , MT2 | |||||||||
Framework for CWMP and USP enabled PON Devices |
| Vacant | ||||||||||
Using PON Access in the context of TR-101 |
| Vacant | ||||||||||
PON in the context of TR-178 |
| LE BRAS Hugues , Orange | ||||||||||
Architecture and Technical Requirements for PON based Mobile Backhaul Networks |
| Samuel Chen , Broadcom | ||||||||||
ONU Management at Scale | This working text defines the NETCONF YANG model for ONUs in a combined NE mode. |
| Robert Peschi , Nokia Joey Boyd , Adtran | |||||||||
WT-509 | YANG modules for Cooperative Dynamic Bandwidth Assignment | This Working Text describes the YANG data models for Cooperative DBA (CO DBA) and Cooperative Transport Interface (CTI) server in ITU-T Passive Optical Networks (PON) OLT devices as defined in ITU-T G.984.x, ITU-T G.987.x, ITU-T G.989.x, ITU-T G.9807.x, ITU-T G.9804.x. The data models described in this working text address the Optical Line Termination (OLT). This data model reuses and in some cases augments existing IETF and BBF YANG models in TR-385 [1]. The support of CO DBA and CTI Server functionality in the OLT are optional. |
| François Fredricx , Nokia | ||||||||
WT-512 | PON OMCI SMA as EAP-OMCI Method | This Working Text maps the OMCI conventional three step sequence into the EAP framework defined in [IETF RFC 3748], as a new EAP method, referred to as EAP-OMCI. The EAP-OMCI method targets as close an alignment as possible with the EAP-GPSK method, while complying with the OMCI SMA defined in [ITU‑T G.988] clause 9.13.11. |
| Frank Van der Putten Nokia | ||||||||
WT-514 | OLT PON Management at Scale | This Working Text scope includes:
Reference NPIF: Proposed NPIF - Common YANG: Large System Management at Scale |
| Jian Zhu, Huawei Robert Peschi, Nokia |
Projects in Straw Ballot or Final Ballot
Please refer to Open Ballots for latest status of these documents.
WT/MD/SD# | PON Management Projects | Abstract | Related Contributions | Editor(s) | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
PON Conformance Test Plan | DTP-247 Issue 4 provides a test plan that may be used to verify conformance of a G-PON / XG-PON / XGS-PON ONU to the requirements defined in TR-156 and TR-280. Additionally, this test plan verifies that the OMCI implementation contained in a G-PON / XG-PON / XGS-PON ONU adheres to the practices described in Appendix I and II of G.988 This document is a corrigendum to TR-247 Issue 4. |
| Vincent Buchoux, LAN | |||||||||
WT-255 Issue 2 is a BBF GPON/XGS/XG Interoperability test plan that describes a series of test cases that may be used to verify the interoperability of an OLT and ONU pairing according to the functional requirements of BBF TR-156, TR-280, and ITU-T G.988. It is intended that these test cases be used with an ONU already awarded the BBF.247 GPON ONU Certification and an OLT known to use standardized OMCI managed entities to implement the configuration under test. |
| Justin Nelson, UNH-IOL |
Recently Completed Projects for this Work Area
Vincent Buchoux, LAN
WT-309 Issue 2 defines a set of test cases whose purpose is to verify interoperability between an XG-PON or XGS-PON OLT and a BBF.247 certified ONU. These test cases address the Transmission Convergence (TC) sub-layer (G.987.3 [6], ITU-T G.9807.1 [8] Annex C). Executing these test cases as part of a multi-supplier test event will help OLT and ONU's implementation of the specifications operate as a functional system.
Assaf Amitai, Broadcom
Vincent Buchoux, LAN
The scope of WT-426 is the verification of NG-PON2 TWDM OLT and ONU interoperability with respect to the Transmission Convergence (TC) sub-layer (ITU-T G.989.3 [7]). Executing these test cases as part of a multi-supplier test event will help OLT and ONU's implementation of the specifications operate as a functional system.
Operators that plan to use ITU-T XG(S)-PON (with or without XG-PON), and NG-PON2 requested the FSAN and BBF Groups to document a PMD (Physical Media Dependent) layer test plan for Conformance Events. Executing these test cases as part of a multi-supplier test event will help OLT and ONU's implementation of the specifications operate as a functional system.
Multiexcerpt | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
WT-352 | Multi-wavelength PON Inter-Channel-Termination Protocol (ICTP) Specification NG-PON2, specified in ITU-T Recommendation series G.989, is a multi-wavelength PON system which includes in its scope an additional interoperability dimension in comparison with the earlier PON systems: one that applies between the OLT channel terminations (CTs) within a single NGPON2 system. The NG-PON2 CTs must exchange information related, among other functionalities, to channel profile configuration and status sharing, ONU activation, ONU tuning, rogue ONU mitigation. OLT channel termination interoperability allows diversification of suppliers of the TWDM and PTP WDM NG-PON2 subsystem, as well as the suppliers of the TWDM CTs for business and residential applications. OLT channel termination interoperability is also instrumental in the case of co-operative multi-operator environments, where different operators share the same ODN each using only a subset of available NG-PON2 wavelength channel pairs. This technical report defines the requirements of the Inter-Channel-Termination Protocol (ICTP), which is used to exchange such information between CTs, enabling inter-vendor NG-PON2 interoperability JIRA contributions | | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Multiexcerpt | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Multiexcerpt | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PON Management ProjectsWT/MD/SD#
IEEE PON YANG Project This working text defines the NETCONF YANG model for IEEE PON Systems. Data modelling language can be used to model configuration and state data of network elements. A standards based model promotes interoperability between NETCONF servers and 3rd party NETCONF clients (e.g., SDN controllers). | Vacant
|
Special Events
- 5th XGS PON Interoperability Test Event (see CONTRIB_21908 for details)
Hiatus FAN Projects
Hiatus projects are BBF projects that have open tickets however no activity has occurred on this project for over a year. The following BBF FAN Projects are considered to be in a "Hiatus" status:
- WT-142 Framework for TR-69 Enabled PON Devices
- MD-396 Gigabit Access over FTTx
- WT-156: Using GPON Access in the context of TR-101
- WT-311: Fiber Infrastructure Management System: Architecture and Requirements
- WT-312: GPON Management Requirements
- WT-331: Architecture & Technical Requirements for PON-based Mobile Backhaul networks
- WT-372: Framework-for-multi-management-PON-devices
- WT-394: NETCONF-managed ONT YANG Model
- WT-395: Discovery for NETCONF-managed ONUs
- WT-431
Moved FAN Projects
WT/SD | Title | Description | New WA |
---|---|---|---|
NETCONF and YANG Data Model Interoperability Test Plans | This working text defines the NETCONF test cases for OLT to 3rd party NETCONF clients. Executing these test cases as part of a multi-supplier test event will help OLT and 3rd party NETCONF client implementation of the specifications operate as a functional system. |
OLT Management Study
This study examines OLT NETCONF management requirements for the purpose of development of BBF NETCONF requirements.
SDN/NFV |